RO-return Project

Some of the RO (Reverse Osmosis) water sent into the production process is used in the mixing-boiling process and in the tea temperature reduction process, which is sent to be stored in a storage tank inside the production building. However, because the tank is small, excess water overflows from the storage tank. Therefore, the engineering team has arranged the RO-return project to bring this excess water back to use by connecting the RO water pipe back into the water storage tank in the utility building.
Outcome and Benefit:
- Reduction of water consumption 243,628 m3